...is finally underway, and the next 2 weeks are going to be a lot of fun. This project has been on the books for a while, but we had to wait for the lumber to get shipped in from California. It's cool-lookin' wood...but the 5 weeks for shipping...not so cool.
Anyways...the job includes a number of projects, including the installation of a massive headboard and the construction of a furniture piece in the master bedroom, all of which is going to get skinned with the reclaimed wood. Today was day #1, always a bit of a slow day on bigger jobs; there are a lot of tools to unload and set up, materials have to be sorted through, and especially on a job like this - there's no real designs set in stone, it's going to be the construction equivalent of free-handing something - a game plan has to be devised. So...progress was slow, but there was progress nonetheless. The reclaimed lumber should show up tomorrow, and by the middle of the week we'll be getting into it. Comments are closed.
|
|